This is the first report developed under Research Project 0-6804, Life Cycle Cost and Performance of Lightweight Noise Barrier Materials along Bridge Structures, a study funded by the Texas Department of Transportation (TxDOT). This is an interim report produced to document all findings to date about the lightweight noise barrier installed as part of this project, including field data as well as analyses and conclusions derived from the data to date.
Para más información, acceda a: http://library.ctr.utexas.edu/ctr-publications/0-6804-1.pdf